Project Systems in Manufacturing

Increase in Network Costs
    Before GuiXT
  • Administering and distributing the network are specified in network assignments
  • The network assignments and operations are not done in the specified dates
    After GuiXT
  • Streamlined process flow decreases the costs
Project Systems Delay
    Before GuiXT
  • The project manager does not enter correct information due to the complexity. While creating a project it affects all the aspects from planning to the cost.
  • Inaccurate reports generated
    After GuiXT
  • No delays since process is simplified and easy to used
  • No need to go to multiple transactions for goods issue since we can combine them with the required fields on one screen